Vector Three Namibia

MIN / VOL

Quantities / reconciliation / change

Stockpile volume surveys

Repeatable drone stockpile surveys and volume calculations for mines, quarries, construction sites and material yards in Namibia.

Discuss this requirement ↗
Stockpile volume surveys field evidence

The decision

Create a defensible quantity record with a defined base surface, date, coordinate system and repeatable capture method.

Best suited to

Where this solution fits.

  • Mine and quarry stockpiles
  • Construction materials
  • Earthworks quantities
  • Monthly reconciliation
  • Before-and-after measurement

Deliverables

What your team receives.

  • Stockpile register and calculated volumes
  • Orthomosaic and surface model
  • Defined base or comparison surface
  • Maps and calculation evidence
  • CSV, PDF and agreed spatial files

Scope inputs

What we define first.

  • Material and stockpile boundaries
  • Base-surface approach
  • Accuracy and control requirement
  • Reporting frequency
  • Required units and file formats

Common questions

Before mobilisation.

How accurate are drone stockpile volumes?

Accuracy depends on control, surface visibility, pile geometry and the selected base surface. We agree the method and limitations before capture rather than promise a generic percentage.

Can surveys be repeated monthly?

Yes. A repeatable capture and naming method supports reconciliation and change tracking over time.

Start with the decision

Tell us what the evidence must support.

We will help define the appropriate method, scope, limitations and delivery format.

Contact us ↗